Blog, News & Events - LineView Solutions

3 Simple steps to getting started with XL800

Written by LineView Admin | December 1, 2014

3 Simple steps to get your XL800 OEE System system working:

Step 1: Connect XL800 OEE System to your process

1.Provide a good count input and reject count input (usually with a sensor or switch).
2.Connect an Ethernet cable to hook XL800 OEE System into your network.
3.Connect the optional barcode scanner (it’s used for scanning down time reason codes).
4.Apply power.

 

Step 2: Configure XL800 OEE System for immediate operation

1.Log into the web page interface from your browser.
2.Configure network communication (IP address, DNS server, etc.).
3.Configure your production schedule (this enables breaks to be displayed).
4.Enter the name of the production asset.
5.Enter your machine run rate.

 

Step 3: View your production in real-time

•That’s it!
•You're ready to kick back and watch production data start flowing to your desktop or iPhone.

 

Designed for speed and simplicity – Provided ready-to-go with a standardised program

Customisable – not custom